Pass Intro 417: Treat Bike Lane Projects Like Other Streets Projects

Under current law, bike lanes are singled out with a required three month waiting period — a requirement that doesn't apply to other projects. Intro 417 would remove this requirement by treating bike lanes the same as other projects.